{"id":2255,"date":"2020-08-28T07:55:10","date_gmt":"2020-08-28T07:55:10","guid":{"rendered":"https:\/\/qualipro.vn\/?p=2255"},"modified":"2024-09-04T06:57:16","modified_gmt":"2024-09-04T06:57:16","slug":"preparing-to-launch-the-tam-dao-bear-rescue-center-construction-project-with-a-contract-signing-ceremony","status":"publish","type":"post","link":"https:\/\/qualipro.vn\/?p=2255&lang=en","title":{"rendered":"Preparing to launch the Tam Dao Bear Rescue Center construction project with a contract signing ceremony"},"content":{"rendered":"\n<p>The Tam Dao Bear Rescue Center expansion project is a project with profound humanitarian significance,\u00a0attracting the interest of many investors.\u00a0After careful consideration of the tender documents,\u00a0the Investor (Animals Asia Foundation) has decided to entrust the construction to Qualipro.\u00a0With this decision,\u00a0the construction contract is expected to be signed in the coming weeks,\u00a0marking a significant milestone in the conservation and protection of bears in Vietnam.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/qualipro.vn\/wp-content\/uploads\/2024\/08\/21.1.jpg\" alt=\"\" class=\"wp-image-2181\" srcset=\"https:\/\/qualipro.vn\/wp-content\/uploads\/2024\/08\/21.1.jpg 1000w, https:\/\/qualipro.vn\/wp-content\/uploads\/2024\/08\/21.1-300x225.jpg 300w, https:\/\/qualipro.vn\/wp-content\/uploads\/2024\/08\/21.1-768x576.jpg 768w, https:\/\/qualipro.vn\/wp-content\/uploads\/2024\/08\/21.1-585x439.jpg 585w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p><strong><em> The Grand Opening Ceremony of Phase 1,\u00a0Tam Dao Bear Rescue Center,\u00a0designed and constructed by QualiPro<\/em><\/strong><\/p>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>The Tam Dao Bear Rescue Center expansion project is a project with profound humanitarian significance,\u00a0attracting the interest of many investors.\u00a0After careful consideration of the tender documents,\u00a0the Investor (Animals Asia Foundation)&hellip;<\/p>\n","protected":false},"author":1,"featured_media":2180,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[],"class_list":["post-2255","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-news"],"lang":"en","translations":{"en":2255,"vi":2182},"pll_sync_post":[],"_links":{"self":[{"href":"https:\/\/qualipro.vn\/index.php?rest_route=\/wp\/v2\/posts\/2255","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/qualipro.vn\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/qualipro.vn\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/qualipro.vn\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/qualipro.vn\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2255"}],"version-history":[{"count":2,"href":"https:\/\/qualipro.vn\/index.php?rest_route=\/wp\/v2\/posts\/2255\/revisions"}],"predecessor-version":[{"id":2257,"href":"https:\/\/qualipro.vn\/index.php?rest_route=\/wp\/v2\/posts\/2255\/revisions\/2257"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/qualipro.vn\/index.php?rest_route=\/wp\/v2\/media\/2180"}],"wp:attachment":[{"href":"https:\/\/qualipro.vn\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2255"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/qualipro.vn\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2255"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/qualipro.vn\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2255"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}